Germany - Two Nations Capitulate - 23 Nov to 21 Dec 1943

23 Nov 1943: The technology for Improved Anti-Tank Upgrade I has been researched.
I deploy a new He 177 Wing in Oberbayern.
I deploy a Fighter Wing and a Stuka Wing in Alsace Lorraine....
....and two new Fighter Wings in Schleswig-Holstein....
....and finally a new Fighter Wing in Hinterpommern. I need Air Wings near to Scandinavia just in case.
My next technology to research is Improved Anti-Air Upgrade I.
The current Research projects.
I deploy another Stuka Wing in Albania.
26 Nov 1943: I create a Garrison Zone for the 2. Armee Russland in Central Asia. Assigned units will automatically assemble there.
02 Dec 1943: The trained 4. Fallschirmjäger-Division is assigned to FJKorps.
The 'Gibraltar' force is in trouble.
05 Dec 1943: I need more Aluminium so I import it from Hungary.
06 Dec 1943:  That was inevitable. We don't want communists in Spain anyway or anywhere in Europe for that matter.. 
Also the UK has regained Gibraltar.
11 Dec 1943: The technology for Improved Decimetric Radar has completed research
I select Centrimetric Radar next.
My Research projects. Jet Engines will arrive next at the end of January.
I ramp up the production of Ju 87 G Stukas.
13 Dec 1943: The Abwehr upgrade Passive Defence (4) has been completed.
I select Suicide Pills next
15 Dec 1943: I plan the construction of 4 times 3 Dockyards.
The Graf Zeppelin and its Air Wing are fully-trained so I order back to port.
I assign three 1940 Destroyer C's and D's to German Reich TF 6. They are minelaying and minesweeping Destroyers.
20 Dec 1943: Siam has problems exporting Rubber to Germany so I import it from British Malaya instead.
21 Dec 1943: The Philippines have capitulated to Japanese forces.
Although not formally allies The British Empire and Japan are cooperating against Comintern. 

Comments